A closer look at the foundation drilling work behind our name. From commercial construction and public facilities to large-diameter foundations, rock drilling, and challenging jobsite conditions, these projects reflect the field experience behind Perez Drilling Co.

Colorado Foundation Drilling Field-Proven Experience
```
The Perez Drilling Portfolio

Some Jobs Deserve
More Than a Picture.

These are the projects that show what happens after the plans meet the ground.

Plans tell us
what needs to happen.

Field conditions tell us what we're actually dealing with. Rock. Tight access. Difficult terrain. Groundwater. Changing scope. Unexpected conditions.

Perez Drilling has worked through all of it. The projects that follow show the range of foundation and drilling work our crews have taken on across Colorado — and the kind of problems we're expected to solve once we're on site.

```
Glenwood Springs, Colorado

When the Rock
Changes the Plan.

This was supposed to be a two-day drilling job. Then we hit the rock.

What looked simple turned into roughly two weeks of rock core drilling. Our crew adjusted to the conditions, kept the equipment working, and stayed with the project.

Field Reality
2 Days Became
~2 Weeks

The ground changed the schedule. We changed the drilling approach and kept the work moving.

The Ground
Unexpected rock changed the job.
The Response
Rock core drilling, maintenance and welding.
The Result
We stayed with it and got it done.

“You don't always get to choose what's under the ground. You do get to choose how you respond when you find it.”

That's foundation drilling in Colorado. Conditions change, equipment gets tested, and Perez Drilling stays focused on finding a way forward.

Vail, Colorado
03
Mountain Project

Mountain Drilling Takes More Than a Drill.

Vail is one of those projects that reminds us how much happens before the first hole is ever drilled.

Mountain access, equipment placement and site conditions all mattered. Our crew worked through the logistics, got the drill where it needed to be and completed the foundation drilling the project called for.

Difficult access. Mountain conditions. Equipment logistics. Another Colorado foundation drilling project completed.

Severance, Colorado

CDOT Infrastructure

04

Infrastructure drilling is measured in accuracy, coordination and readiness for what comes next.

On this CDOT project in Severance, Perez Drilling performed foundation drilling as part of the transportation work. The scope required precise drilling within an active infrastructure project and coordination with the work around us.

Project Type
Transportation Infrastructure
CDOT Project
Severance, Colorado
Montrose, Colorado
05

Montrose

Some jobs are about getting in, getting the work done, and getting out without making a production out of it.

Montrose was one of those projects. We made the trip, got set up and handled the deep drilling work. It was straightforward field execution—the kind of job where experience shows in the setup, the drilling and a clean finish from start to completion.

Completed Project / 02

Larimer County
Jail Expansion

Fort Collins, Colorado
Public Infrastructure
Drilled Caisson Foundations
The Assignment

Foundation caisson drilling for the expansion of a major Northern Colorado detention facility.

Perez Drilling Co. performed drilled caisson foundation work for the Larimer County Jail expansion in Fort Collins, Colorado. The project required drilled foundations as part of a major public-sector construction program.

Foundation drilling is one of the first critical operations in structural construction. The work must follow the engineered foundation requirements while coordinating with the construction schedule and the trades that follow.

The overall project involved JE Dunn Construction as general contractor and DLR Group as the design firm. Perez Drilling's scope was foundation caisson drilling.

Project Focus
Drilled Foundations.
Institutional Construction.

The Larimer County Jail expansion demonstrates Perez Drilling's experience performing caisson drilling on large public-sector construction projects in Northern Colorado.

Project Overview
Foundation Scope
Drilled caisson foundation work.
Project Type
Public detention facility expansion.
General Contractor
JE Dunn Construction.
Design Firm
DLR Group.

Project References: JE Dunn Construction  |  DLR Group

Completed Project / 03

Longmont
Home Depot

Longmont, Colorado
Commercial Retail Construction
Drilled Caisson Foundations
The Assignment

Drilled caisson foundations for a 130,000-square-foot commercial retail development.

In 2000, Perez Drilling performed caisson foundation drilling for the new Home Depot development at 393 South Hover Road in Longmont, Colorado. The project involved Haselden Construction and the construction of a 130,000-square-foot retail facility.

Large commercial buildings depend on properly constructed foundations. Drilled caissons must meet the engineered requirements for location, diameter, depth, and bearing conditions before subsequent foundation construction can proceed.

Perez Drilling's responsibility was the drilled foundation work supporting construction of the retail building. The project remains part of our foundation drilling history along Colorado's Northern Front Range.

Project Experience
Commercial Foundations.
Proven Field Experience.

From retail developments to institutional and infrastructure projects, Perez Drilling brings field experience to drilled foundation work throughout Colorado.

Project Overview
Foundation Scope
Drilled caisson foundations.
Facility Size
130,000 square feet.
Construction Team
Haselden Construction.
Project Year
2000.

Project References: Haselden Construction  |  Home Depot — Longmont